SQYPower — Daily Battery Log

PP Techniq A/S · Secure field data entry

SQYPower
⚠️

Log entry saved

Today's entry for has been recorded and sent to the PP Techniq operations log.

Loading unit…

Fields marked are required

⚡ 10-day charge rule — read before completing this form Every SQYPower unit must complete a full 100% charge including absorption cycle at least once every 10 days. Failure to do so causes inaccurate SoC readings, reduced runtime, battery degradation, siren activation, deep discharge cut-off, and may render the unit unsafe for platform ascension. Balancer status must show "Balanced" — confirmed via GX display.

Unit & date

Enter the serial number from the label on the front panel of this unit.
Format: SPC43682/02 — letters and numbers, forward slash, then 2 digits.

Check the label on the front panel or the CE plate inside the side panel.

Battery readings

GX display Pages Battery

AGM: ⚠️ below 45.6V · ⛔ cut-off at 40.8V
LFP: cut-off managed by Lynx BMS at cell level

GX display Pages Battery SoC %

SoC is only accurate after a full 100% charge + absorption cycle. If SoC has not been recalibrated recently, use Voltage and Ah as primary references.

GX Pages Battery Current

Enter the current shown on the GX battery page. Positive = charging · Negative = discharging · 0A = absorption complete or idle.
When SoC = 100% AND current = 0A, full absorption is automatically confirmed.

Charge & balancer status

Auto-filled today when SoC = 100% and current = 0A is detected above. If completing a manual entry, enter the date the unit last reached 100% SoC with 0A absorption current.

GX Menu Lynx Smart BMS System Balancer Status

Do not use this unit for platform ascension until Balancer Status shows "Balanced" within the last 10 days. An unbalanced battery may trip mid-ascension, leaving the platform without power at height.

GX Pages Charger status

Input selector switch (component 4): position 1 = single phase · position 2 = three phase · position 0 = off.

Visual inspection ✱ all required

No smoke, heat, or burning smell

If any of these are present: evacuate area, turn Main switch (12) OFF, turn Input selector (4) to 0, disconnect AC. Do NOT open panels. Call emergency services if fire cannot be contained.

CEE connectors clean — no burn marks, cracks, or damage
Components (2)(3)(5) Input & output connectors

Check all three CEE connectors (Input 1 / Input 2 / Output 32A). Any burn marks or melted plastic → do not energise, escalate immediately.

Ventilation openings clear — no blockage
Component (9) Fan / vents bottom of panel

Especially important in lifting bag deployments — air channels must remain open to prevent thermal shutdown.

GX display operational — screen on, not frozen
Component (7) GX colour touchscreen

GX display powers on and off with the Main switch (12). If blank after 60 seconds, check VRM portal for last alarm before cycling power.

No active alarms on GX display
GX Menu Notifications

Do not clear active alarms without identifying the root cause first. If alarms are present, record details in the Notes field below and escalate.

Audible sounder — NOT active
Component (10) Sounder front panel

AGM: sounder activates below 45.6V, ceases when voltage recovers above 45.6V for 30 sec. LFP: sounder triggered by Lynx BMS alarm — connect AC and check GX immediately.

Operator